Bell Aircraft Photos

For additional information about these photographs, contact

Dr. Thomas A. Scott
Department of History and Philosophy
Kennesaw State University
Kennesaw, GA 30144

6.603.12229 Plastic Nose Manufacturing
1287 SE Corner, B-4 Building, 06/07/43

1289 SE Corner, B-3 Building, 05/31/43
1290 SE Corner, B-1 Building, 05/31/43

1370 Looking East, Left Side, Area B-5-4-3-2-1, 06/07/43
1393 Dept. 51-Metal Fabrication, 06/07/43

1403 B-2 Building, 06/07/43
1404 Exterior View, 06/07/43

1405 Looking SE towards airport, 06/07/43
1406 B-3 Building, 06/07/43

1407 B-4 Building, 06/07/43
1408 Apron at east end B-1 Building, 06/07/43

189 Head House #4, 06/07/43
395 South side B-1 looking west, 05/24/43

508 Looking across B-5 area, 05/03/43
510 Looking due east across area B-5, 05/03/43

5488 Workers in the plastic nose section, no date
581 Looking southwest at B-1, 05/03/43

6.210-A25192 John A. Chiles, William B. Hartsfield, E.R. Hawkins, and Jimmy Winn, 09/10/45
6.210-A5580 Omar Woodson, Gen. Wolfe, 11/04/43

6.461.073-A 4755 B-29 in flight, no date
6.461.087-A 17569 B-29 & P-77 at Georgia, copied 04/27/45

6.461.087-A5287 The Georgia Peach
and Maj. Millar, 09/13/44
6.461.091-A4878 B-29 Landing in Marietta,
no date

6.520-10841 Photographic dept., duplicating section (John T. Tucker, Lenora Orr,
Howell Kitchens, Julius W. Sheibler), 01/21/44
6.520-13465 "Georgia Peach"
Mary Etta Hobbs-riveter at Bell, no date

6.520-14298 Photographic Dept., no date
6.520-17288 Orientation Class at "426"
Mrs. MaNita Dunwody, 07/05/44

6.520-22688 Major Stephan O. Dillon
flight operations officer, no date
6.520-340 Mark Heaney
Manager, flight test division, no date

6.520-3421 Robert Morris
Bell test pilot, no date
6.520-369 R. E. Anderson, Assistant Manager of Service in charge of Georgia Division, no date

6.520-370 William S. Kelley, Technical
Prime Contractors Representative, no date
6.520-372 Clyde H. Thompson, Assistant
Superintendent in charge of machine fabrication, no date

6.520-374 Ralph W. Varrial, Manager, Production Engineering Depart., no date
6.603.1.677-342 Plant under construction
07/20/42

6.603.1.677-348 Plant under construction, 07/20/42
6.603.1.677-351 Plant under construction, 07/20/42

6.603.1.677-352 Plant under construction, 07/20/42
6.603.1.677-353 Plant under construction, 07/20/42

6.603.1.677-354 Plant under construction, 07/20/42
6.603.1.677-358 Plant under construction, 07/20/42

6.603.1.677-359 Plant under construction, 07/20/42
6.603.1.677-360 Plant under construction, 07/20/42

6.603.1.677-366 Excavation work, 07/27/42
6.603.1.677-367 Excavation work, 07/27/42

6.603.1.677-368 Excavation work, 07/27/42
6.603.1.677-370 Tunnerl under construction, 07/27/42

6.603.1.677-371 Excavation work, 07/27/42
6.603.1.677-372 Tunnel under construction, 07/27/42

6.603.1.677-376 Construction work, 07/27/42
6.603.1.677-382 Construction work, 07/27/42

6.603.1.677-394 Tunnel under construction, 08/03/42
6.603.1.677-401 Tunnel under construction, 08/03/42

6.603.1.677-403 Construction work, 08/03/42
6.603.1.677-406 Construction work, 08/03/42

6.603.1.677-409 Construction work, 08/03/42
6.603.1.677-411 Construction work, 08/03/42

6.603.1.677-413 Construction work, 08/03/42
6.603.1.677-418 Tunnel 1 excavation, 08/01/42